Article

A stalled migration, finished

· Adrian Sullivan

An Australian and New Zealand fashion retailer had moved SQL Server to Azure. It was slow, it was expensive, and an earlier migration had stalled before everything made it across.

Half-migrated is the worst place to be. The cost of the new platform without the benefit, and a team that had lost confidence the move would ever land.

We stepped in and finished the migration to private cloud.

The estate runs on a 35% lower operating cost, and the migration is actually done.

After the earlier migration stalled, sqldba stepped in and finished it. — Bob, IT Manager

A migration that drags is a migration that costs. A free, read-only health check tells you where yours really stands. No install. No obligation.

Free health check

Want to know if this is sitting in your estate? We run a read-only check and hand you a graded report in plain English.

Get your free health check

← All posts